ESG Node | Documentation
Go to App →
Contents
Docs

ESG Node Documentation

Everything you need to analyze, build, and improve your sustainability reports — faster and smarter.

Last updated: 10 October 2026

Overview

ESG Node is a web-based platform that helps organizations prepare, analyze, and improve their ESG (Environmental, Social, and Governance) sustainability reports. Upload your PDF, select a standard, and get requirement-by-requirement compliance scores with exact quotes from your document as evidence.

📤
Upload
Upload your sustainability PDF report (any language; paid plans also take Word, PowerPoint, Excel and text files)
🔍
Analyze
AI maps your content against every requirement of the chosen standard
📊
Improve
See gaps, read AI-drafted improvements, export full compliance reports

Quick Start

Get your first analysis done in under 5 minutes:

1
Create an account at esgnode.com/register. All new accounts start with a 3-day Professional trial — no credit card needed.
2
Go to Dashboard and use "Upload New Report".
3
Upload your PDF (your sustainability report or draft — within your plan's page limit). The new report is highlighted in Recent Reports.
4
Click "Run analysis →" on the report's row. In "Select Standards to Analyze", pick one or more standards (e.g. GRI Universal, IFRS S1, TNFD). Your own rubrics are listed under "Custom Rubrics" in the same list.
5
Click "Run Analysis". Results appear in 1–5 minutes depending on report length.
6
Review results — green = found, red = missing, with exact quotes and AI-drafted improvements for each gap.
Tip: You can run several standards on the same PDF. They run together as one analysis, and each standard you select uses one analysis credit. Each custom rubric you pick runs as its own, separate analysis.

Account & Login

Registering

Go to esgnode.com/register. Enter your email and a password, accept the Terms, then click the verification link we email you. All new accounts start on a 3-day trial of the Professional plan.

Logging In

Visit esgnode.com/login. Enter your email and password, then click "Sign in". A bot check (ALTCHA) runs by itself when the page loads: there is no puzzle to solve. If you are very quick, wait for the check to finish before you sign in. It protects the platform from bots and brute-force attempts.

Google and single sign-on

  • "Sign up with Google" (register page) and "Continue with Google" (login page) work with Gmail and Google Workspace addresses. No verification email is needed: a new account starts with the same 3-day Professional trial. For other addresses, use your email and a password.
  • "Sign in with SSO" on the login page is for Enterprise teams that have set up single sign-on: enter your work email and click "Continue with SSO".

Automatic sign-out

For your security, you are signed out after 2 minutes without activity in any ESG Node tab. Working in one tab keeps the others signed in.

  • At 100 seconds, "Still there?" appears with a countdown. Click "Stay signed in" to continue.
  • The sign-in page then says: "You were signed out after 2 minutes without activity…"
  • Text you had not saved on that page is kept in that browser tab. Sign in again: it is filled back in, or listed in a "Text you had not saved" panel with "Copy".
  • The payment window and uploads or saves in progress never sign you out.

Forgot Password

Click "Forgot password?" on the login page. Enter your registered email. If an account exists, you will receive a reset link within a few minutes. Check your spam folder if it does not arrive.

Note: The reset link is valid for 1 hour. After that, request a new one.

Changing Your Password

Go to Profile in the sidebar → scroll to "Change Password" → enter your current password and your new password twice (at least 8 characters) → "Update password".

Signed in with Google or SSO in the last 10 minutes? The current password is not needed: enter only the new one. This is how an account made with Google gets its first password: sign out, click "Continue with Google", then open Profile within 10 minutes.

Email updates

Go to Settings → Account and use the "Email updates" switch for product news and ESG reporting tips. Account emails, such as password resets and analysis results, always arrive.

Cookies and privacy

A ribbon at the bottom of the page explains that ESG Node uses only essential cookies and local storage, to keep you signed in and the site working, with no advertising, analytics or tracking cookies. "How we use them" opens the Privacy Policy; "OK" closes the ribbon.

Deleting Your Account

Go to Profile → "Danger Zone" and click "Delete my account". Type your email address and your password, then click "Yes, delete my account". This permanently deletes your account and all associated data. It cannot be undone.

  • Signed in with Google or SSO in the last 10 minutes? Type only your email address: no password is needed.
  • Your personal plan is cancelled at once, with no further charges. Refunds follow the Refund Policy.
  • If you own a team, cancel the team plan (or contact us) first: the delete is blocked until then.
  • Unused Developer API credit is lost.

Uploading a PDF

Supported file types

On the Dashboard and in My Reports, "Upload New Report" has two options:

  • "Single PDF": one PDF file, on every plan.
  • "Several files → one report" (paid plans): PDF, DOCX, PPTX, XLSX, CSV, TXT, MD and XML files (max 50MB each), plus public web pages added in the "Web page (optional)" field with "Add". Everything is combined into one report and uses one upload. Up to 5 files or links per upload on Professional, 10 on Team and 15 on Enterprise. Click "Upload as one report" when your list is ready.

On Starter, the second option explains that several files, Word/Excel/PowerPoint files and web pages come with paid plans, before you pick any files: upload one PDF at a time.

File size and page limits

PlanMax file sizeMax pages per PDF
Starter50 MB15 pages
Professional50 MB100 pages
Team50 MB300 pages
Enterprise50 MB600 pages
Tip: Scanned PDFs (image-only, no text layer) produce poor results. Use PDFs that have selectable text. If your PDF is scanned, run it through an OCR tool first (e.g. Adobe Acrobat's "Recognize Text").

Upload limits (monthly)

Each plan has a monthly upload quota. Uploads reset on the 1st of each calendar month.

PlanUploads / month
Starter3
Professional15
Team45 (shared by the team)
Enterprise150 (shared by the team)

Running an Analysis

Upload your report first (see Uploading a PDF). Then click "Run analysis →" on the report's row in Recent Reports (Dashboard) or My Reports. The "Select Standards to Analyze" dialog opens:

  • Pick one or more standards. They run as a single analysis with one score.
  • Your own rubrics are listed under "Custom Rubrics" in the same list. Each rubric runs as its own analysis, separate from the standards.
  • Click "Run Analysis" (or "Run N Analyses" when rubrics are included).

For a report that already has results, use the "Re-analyze" button in the row's Actions.

How long does it take?

Most analyses complete in 1–5 minutes. Longer reports (100+ pages) against large standards (e.g. GRI 200–400) can take up to 10 minutes. You do not need to keep the browser tab open — results are saved and available in My Reports whenever you return.

Analysis credits

Each standard selected = one analysis credit consumed. Running GRI + IFRS S1 simultaneously on one PDF = 2 credits.

PlanAnalyses / month
Starter6
Professional30
Team90 (shared by the team)
Enterprise300 (shared by the team)
Pay Per ReportPer order (no subscription needed)

AI Draft Improvements

Paid plans include AI-generated draft text for each missing or partial requirement. These drafts are starting points — review and adapt them to reflect your organization's actual data and context before use.

Starter plan users can view scores and evidence quotes, but AI drafts are hidden. Upgrade to Professional to unlock them.

Understanding Results

Score indicators

StatusMeaning
🟢 FoundThe requirement was addressed in your report with sufficient evidence
🟡 PartialSome aspects found but the coverage is incomplete
🔴 MissingNo evidence of this requirement found in your document

Evidence quotes

For each "Found" or "Partial" result, ESG Node shows the exact sentence(s) from your PDF that matched the requirement. The PDF viewer next to the results jumps to the page where the evidence appears.

Confidence scores

Each result has a confidence score (0–100%). This reflects how certain the AI is that the evidence truly satisfies the requirement. The badge is green at 70% or more, yellow from 40% to 69%, and red below 40%. A low score means the match is ambiguous: check the quote yourself.

Overall compliance score

The results page shows your overall score as "Score: N%". It is calculated as (Found + ½ × Partial) ÷ all requirements in the analysis. Every requirement counts the same. Use it to track improvement across revisions.

GRI reporting claim

When a GRI standard is part of your selection, the "Select Standards to Analyze" dialog shows "GRI reporting claim" with two options:

  • "With reference" (the default).
  • "In accordance": link a completed GRI materiality assessment ("Select a completed GRI materiality assessment…"), or tick "Or: this report already includes its own completed materiality assessment". You also enter the "Reporting entity (legal name)", "Period start" and "Period end". The GRI standards that "in accordance" requires are added to the run and listed under "Will also include"; like any standard, each one uses an analysis credit.

The results page shows the claim as a badge. An "In accordance" run gets a verdict: "IN ACCORDANCE" or "NOT IN ACCORDANCE". This is a preliminary check, not a substitute for a GRI Report Services review.

Actions menu

The "Actions" menu on the results page appears only for the owner of a finished analysis. It holds:

  • "Compare Reports" (Professional and above) — see Compare Reports.
  • "Patch into Report" (Team and Enterprise): turns a single-standard analysis into a report draft in the editor. Requirements found in your report start with the matching text; missing ones start empty.
  • "Export as": "Word (RTF)", "Excel" or "PDF".
  • For a GRI claim, also "GRI Content Index (XLSX)" and a written report: "Conformance Report" ("In accordance") or "Coverage Map" ("With reference"), each as PDF or Word (RTF).
  • "Make Public" / "Make Private". Once public, a "Share" button appears next to the menu.

Exporting results

Open "Actions" on the results page and choose "Export as" Word (RTF), Excel or PDF to download a full compliance report. The PDF includes: all requirements, your status for each, the evidence quotes, and the AI-suggested improvements.

Exports fill in your company name, reporting year and period, read from the report itself. Values you entered yourself (for example the reporting entity and period of a GRI "In accordance" claim) always win. The GRI Content Index and the Conformance Report or Coverage Map say when these details were read from the report, so confirm them before publishing.

Export is available on paid plans, and for Pay Per Report orders that include the export add-on. Your saved brand is applied on paid plans.

Dashboard

The Dashboard is your home base. It shows:

  • Plan banner — your current plan (marked "(trial)" during a trial) and its limits, for example "15 uploads/month · 100 pages max"
  • Key figures — Reports (total uploaded), Analyses (total run), Avg Score, Best Score and This Month (reports uploaded this month)
  • Recent Analyses — jump back to a recent result
  • Latest Compliance Snapshot — Found / Partial / Missing counts of your most recent analysis
  • Insights — your most-used standard and the number of comparisons run
  • Upload New Report — upload without leaving the page (see Uploading a PDF)
  • Recent Reports — your latest uploads, with "Run analysis →" for reports not analyzed yet

When you reach a monthly limit, the upload or the analysis tells you (see Analysis Issues).

My Reports

My Reports shows your uploaded documents, the analyses run on each, and your AI-generated reports. It also has "Upload New Report", the same as the Dashboard. Under "Uploaded Reports" you can:

  • Search by file name ("Search files...")
  • Filter by status: All status, Done, Processing, Pending, Failed or Not analyzed
  • Sort by File, Pages or Date (click the column heading)
  • Per report: view the latest analysis, expand to see all its analyses, rename, re-analyze, or delete (removes the uploaded file and all its analyses)

Below, "AI-Generated Reports" lists the reports you build with Create a Report: "Continue →" while you are writing, then view, download (Word (RTF) or PDF) or delete.

Analysis exports and sharing live on the results page, not here: open the analysis, then "Actions" → "Export as". To share, use "Actions" → "Make Public"; a "Share" button then appears.

Compare Reports

Compare two or more reports side by side — useful for tracking improvement between your draft and final report, or benchmarking against peers.

1
Navigate to Compare Reports in the sidebar.
2
Choose Standards-Based (every requirement of one standard) or Wildcard (topics found in the reports, Enterprise).
3
Select the standard and the reports to compare. Every report must be analyzed before it can be compared.
4
Click "Run Comparison" — each requirement shows its status in every report, with the supporting quote and page.
In a standards comparison, a report that already has a completed analysis against that standard keeps that analysis's status, quote and page, so the comparison and the analysis never disagree. Use Export on the results page to download the comparison as Excel (XLSX) or PDF.

Create a Report All plans

Instead of analyzing an existing PDF, Create a Report helps you write a sustainability report from scratch. You write each requirement's section in the editor, with AI help, then ESG Node generates a full report draft from your sections.

"Authoring is free — pay only to generate." Every plan can write a report. Generating it is included on Enterprise (fair use: 10 generations a day per person) and for 2 report builds a month on Team. Otherwise you pay once when you generate: $99 for 1 standard, $149 for 2, $199 for 3 or more, with PDF and Word (RTF) export included. Regenerating a report you already paid for is free.

How it works

1
Go to Create a Report in the sidebar (or the "Create a new report" card on the Pay Per Report page).
2
"Select Reporting Standards": pick one or more standards. For each, choose "All Requirements" or "Selected Requirements".
3
"Base the report on a materiality result": choose a finished materiality assessment (Professional and above), or "Continue without a result →". Material topics decide what the report covers in depth.
4
"Company & Report Details": report title, company name, industry, headquarters country, reporting year, number of employees, revenue range, language style (British or American English) and additional context (optional).
5
"Report Branding" (paid plans): your logo, colours and fonts for this report's PDF and Word exports. Then click "Start Writing →".
6
Write your sections in the report editor. Click "Mark complete" on each finished section: you need at least one complete section to generate.
7
Click "Generate Report ✦". The "Generate Full Report" dialog shows what is included, or the one-off price with a "Discount code" field. Click "Generate ✦" or "Pay $X & Generate ✦". Generation runs in the background: you can close the window.
8
When it is done, download the report as PDF or Word (RTF) from the report page. You can also Humanize it.

Important notes on AI-generated content

AI-generated reports are starting drafts only. They will not contain your actual data, metrics, or real incidents unless you add them. You must review, customize, and verify every section before using the report externally or submitting it to any regulator or auditor.

Report Editor

The editor opens after "Start Writing →", or with "Continue →" in My Reports. Pick a requirement, write its section, and save. The side panel has three tabs: "✦ AI Assistant", "Data" and "Content Index".

✦ AI Assistant

Choose a mode, then run it on the open section:

  • Draft — "Generate a professional draft disclosure from scratch." Button: "Draft for me".
  • Improve — "Polish and strengthen your existing content." Button: "Improve my text".
  • Coach — "Get specific guidance on what data and language this requirement needs." Button: "Coach me".

In Draft mode, the "Verbosity" slider sets the length from 1 (Minimal) to 5 (Very detailed); the default is 3 (Standard). Longer drafts add more placeholders for you to fill, never invented facts. Click "↑ Use this draft" to put a Draft or Improve result into the section. An approved section must be reopened first.

In a report made with "Patch into Report", a requirement the analysis found partial or missing can show an "AI Hint from Analysis" with "Use as starting point". The AI Assistant is for the report owner, with up to 300 requests a day.

Data

Fill the [gaps] in a section with figures from your report data. Open "Report data" to add figures:

  • "Upload a data file": Excel (.xlsx, .xls) or CSV, up to 2 MB, with a Metric column and a Value column (Unit, Period and Note are optional), or years as columns. Only the values, where they sit (sheet and cell) and the file's fingerprint are kept, not the file. Up to 20 files and 5,000 values per report.
  • "Download the template": a CSV of common metrics with empty values.
  • "Type a value in": for a figure that is in no file. It is labelled with your name.
  • "AI reading of your metrics": the AI reads each metric's name, unit, sheet and note (never the figures) and says which requirements it belongs to.

Under "Gaps in this section", each gap gets suggestions with a "Fill" button. Nothing is filled until you click Fill, and each figure keeps its source (for example the file, sheet and cell, or "Typed in by" and your email). The owner and editors fill gaps; viewers can only read.

Content Index

Choose where generation puts the content index:

  • "At the end of the report" (default): a "Content Index" after the last chapter, with each framework's requirements and the pages where they are covered.
  • "In line": beside each paragraph, on the right, the framework and requirement code it covers.
  • "Build my own index": no index in the report.

Click "Save". The choice applies the next time you generate the report. Only the report owner can change it. A table of contents is always added after the title page.

Generating

Click "Mark complete" on each finished section (it then reads "✓ Complete"). "Generate Report ✦" works once at least one section is complete; only the report owner generates. See Create a Report for prices.

Assurance Trail

The trail records who wrote and approved each section of a report you create, so you can show your auditor how the text came about. Open it with the "Assurance" button in the report editor: "Sign-offs, version history and a read-only link for your auditor."

Version history (all plans)

"History (N)" next to Save lists the saved versions of the open section. Click "Restore this version", then "Restore": the current text stays in the history as its own version.

Team and Enterprise

  • Each section has "Assign:" (a team member), "Review:" (Draft / In Review / Approved) and Comments.
  • Approving locks the section: "Approved by … on … · version N · locked. Reopen it to change the text." "Reopen" asks "Why are you reopening this approved section?"; the reason is kept in the trail, then "Reopen section". A locked section can be reopened on every plan.
  • "Assurance binder" (report owner): "Download PDF" or "Download Excel".
  • "Auditor links" (report owner): a link valid for 7, 30 or 90 days, with the option "Show who edited and approved (emails)". Click "Create link" and copy it at once: it is shown only once. Anyone with the link can read the report's sections, evidence, sign-offs and history without signing in, and change nothing. "Revoke" stops a link at once.

Humanize

Humanize rewrites a generated report in a natural voice. Figures, codes and [DATA REQUIRED] notes stay exactly as they are.

1
On the finished report's page, click "Humanize" (report owner; the report must be one you can export: a paid plan, or a report you paid for).
2
"What should be rewritten?": "Whole report" or "Selected sections".
3
The price follows the number of words that need a rewrite, with a minimum of $2 (shown as "(minimum charge)"). Discount codes do not apply.
4
Click "Pay $X and humanize".

The version picker on the report page then lists "Original" and "vN · Humanized" with its date. Your original always stays unchanged. With a humanized version shown, downloads include "PDF, both versions (ZIP)" and "Word, both versions (ZIP)", next to PDF and Word (RTF).

Humanized text is rewritten by AI: review it before you publish. If the rewrite cannot be completed, or nothing can be rewritten, you are refunded in full automatically.

Materiality Assessment Professional

The Materiality Assessment (also called DMA — Double Materiality Assessment) guides you through a materiality assessment on the basis you report under: ESRS double materiality (the ESRS as amended in 2026: required from FY2027 and can be applied in full to FY2026), GRI 3 impact materiality, or your own framework. Assessments made earlier under ESRS Set 1 stay available.

What is double materiality?

Double materiality looks at sustainability topics from two angles:

  • Impact materiality — does your business impact people or the environment (positively or negatively)?
  • Financial materiality — do sustainability factors create financial risks or opportunities for your business?

Under ESRS a topic is material if it is significant on either dimension. Under GRI 3 only the impact dimension counts: a topic is material when its impacts are among your most significant.

The four steps

On the ESRS and Custom bases the steps are A to D below. On the GRI basis they follow the four steps of GRI 3, as the next section explains.

StepWhat to do
A. ContextChoose the basis you report under, describe your scope and value chain, record the stakeholders you engaged, and set (or accept and document) the scoring method and thresholds.
B. IdentifyScreen the topic list (excluded topics need a reason) and record the actual and potential impacts, risks and opportunities of each topic: where in the value chain, over which time horizon, and whether human rights are involved.
C. AssessScore each entry. Negative impacts: scale, scope and irremediable character, plus likelihood when potential (severity takes precedence for human-rights impacts). Positive impacts: scale and scope. Risks and opportunities: likelihood and financial magnitude. Each score shows the reason it is or is not material.
D. Decide & reportReview each topic's decision and what drove it, add the explanations required (for example why climate change or a sector topic is not material), record the approval, and copy or export the disclosure drafts (GRI 3-1, 3-2, 3-3; ESRS IRO-1, IRO-2, SBM-3, SBM-2).

GRI basis: the four steps of GRI 3

On the GRI 2021 basis the steps carry GRI 3's own names, and each one opens with "What GRI 3 asks in this step": a checklist that ticks itself as you record the work, with the items required for "in accordance" marked. You do not need to read GRI 3 first.

StepWhat to do
1. Understand contextDescribe your activities, your business relationships and the sustainability context they sit in (for example water stress or weak labor law), and give an overview of your stakeholders. Tick the GRI Sector Standards of your sectors (see below).
2. Identify impactsUnder "How you find impacts", tick the methods you used (due diligence, grievance mechanisms, audits, stakeholder and expert input and others) and name the sources and evidence. Then record the actual and potential impacts behind each topic. A Sector Standard topic shows what it covers in your sector and the "Impacts to check".
3. Assess significanceScore each impact: scale, scope and irremediable character, plus likelihood for potential impacts (severity comes first for human-rights impacts). Positive impacts: scale and scope.
4. Prioritize and reportSee your impacts ranked against the threshold (negative and positive apart), test the topics against every topic of your Sector Standards (each one decided, a reason for each one that is not material), test the list with experts and users of your report (record them under stakeholder engagement with the step-4 box ticked, then say what changed), note any external assurance of the process, get approval, and see what to report for each material topic.

Steps 1 to 3 are ongoing work: you can update them through the year as you learn more from stakeholders and experts. Step 4 turns that work into the list of material topics for each report.

GRI Sector Standards and Topic Standards

In "About the assessment", the GRI Sector Standards are listed as cards: who each one is for, its topics, and whether it is in effect. From the industry you enter, the likely ones are marked "Suggested"; tick each one for a sector where you have substantial activities. Ticking one shows the Topic Standards its topics point to, with the dates when newer standards replace older ones (for example GRI 102 and GRI 103 replace GRI 305 and GRI 302 for reports published from 1 January 2027).

  • Seven Sector Standards are available: GRI 11 Oil and Gas, GRI 12 Coal, GRI 13 Agriculture, Aquaculture and Fishing, GRI 14 Mining, and the 2027 standards GRI 16 Banking, GRI 17 Capital Markets and GRI 18 Insurance. The 2027 standards take effect for reports published from 1 January 2029; GRI encourages using them earlier.
  • Each ticked standard adds its topics to step 2. Every one must be decided: material, or not material with a reason. The reasons go into the GRI content index.
  • If no Sector Standard covers your sectors, step 1 asks how you considered the impacts common to your sectors, products and locations.

Saving and resuming

Every change is saved as you go and logged. Your assessments are listed under Materiality in the sidebar, with what is still open; click Continue to pick up where you left off. An approved assessment is locked; reopening it needs a reason. Next year, start from last year's assessment instead of from scratch.

GRI 3 outputs on an ESRS basis

On the ESRS basis, tick "Also prepare GRI 3 outputs" to get the GRI 3-1, 3-2 and 3-3 drafts as well. GRI Sector Standard topics are then added for review. A completed assessment with GRI outputs (GRI 2021 basis, or ESRS with this option) and no open items can back a GRI "In accordance" analysis.

Record an assessment done elsewhere

Already have a result, for example from a consultant or last year's process? Click "Record an assessment done elsewhere". Choose the standard, describe the result and how it was reached (process and thresholds, stakeholder engagement), then record each topic's decision with its rationale. No scores are needed. Click "Record the result". It is checked like any assessment and labelled as recorded, not assessed here.

Downloads and next steps

A completed assessment offers "Memo (PDF)", "Memo (Word)", "Memo (RTF)" and "Register (Excel)". The same downloads are in step D, on the "Outputs" tab. Click "Create a report from this result" to open Create a Report with this result selected and your company details filled in; you choose the standards next. The result does not need to be approved first.

Where the rules come from: The scoring rules come from the standards themselves (GRI 3, ESRS 1 and the amended ESRS 1): severity from scale, scope and irremediable character, likelihood for potential impacts, and severity before likelihood for potential human-rights impacts. EFRAG IG 1 (May 2024) is non-authoritative implementation guidance: the tool uses it as a reference, not as a required method. The thresholds are a starting point that you calibrate and explain.

Custom Rubrics Paid plans

Custom rubrics let you analyze reports against your own criteria. For example, you could add internal company KPIs or investor-specific requirements that are not in any public standard. A rubric runs as its own analysis, separate from any standard. Paid plans only: up to 5 rubrics on Professional, 10 on Team and unlimited on Enterprise.

Creating a rubric

1
Go to Custom Rubrics in the sidebar.
2
Click "+ New Rubric". In "New Custom Rubric", enter the "Rubric Title".
3
Under "Requirements", fill one row per criterion: Code (optional), Title and Description (optional). Use "+ Add row" for more.
4
Click "Create Rubric".

Or click "Import Excel": download the template (columns Code, Title, Description), then upload a .xlsx, .xls or .csv file up to 10 MB with a rubric title, and click "Import Rubric".

Running a rubric

Upload the report, click "Run analysis →" on its row, and pick your rubric under "Custom Rubrics" in the "Select Standards to Analyze" list. Click "Run Analysis". Each rubric you pick runs as its own analysis and uses one analysis credit.

Chat with PDF Professional

On the results page of a finished analysis, the report's owner sees a "Chat with PDF" button (Professional plan or higher). It opens a chat about the report itself: ask anything, for example "What are the Scope 1 emissions?" or "Summarize board governance".

Answers come from your report's text and show the pages they used. Click a page badge to jump to that page in the PDF.

Team & Collaboration Team & Enterprise

On Team and Enterprise plans, Team in the sidebar opens "Team & Collaboration". The team shares one plan: uploads and analyses are pooled.

Members and seats

  • "Your team" shows the seats in use, for example "Team plan · 2 of 3 seats used" (Team has 3 seats, Enterprise 10). Pending invitations count as seats.
  • "Members" lists everyone with their role: Owner, Admin or Member. The owner and admins manage the team.
  • To invite, enter a colleague's email, choose Member or Admin, and click "Invite". Invitations expire after 7 days; "Pending invitations" can be revoked.

Single sign-on (Enterprise)

Under "Single sign-on", a "Step-by-step setup guide" walks the account owner through it, with the exact steps for Microsoft Entra ID, Okta, Google Workspace and other OpenID Connect providers:

  1. Email hello@esgnode.com the domains your team signs in with. We add them under "Email domains" with a DNS TXT record to publish; each shows "Waiting for DNS" until it is "Verified".
  2. Create an app at your identity provider with the redirect URI shown on the page (it has a "Copy" button).
  3. Enter its "Issuer URL", "Client ID" and "Client secret" and click "Save and check".
  4. Test it: "Sign in with SSO" on the login page, from a private window.
  5. Optional: require single sign-on for everyone on the verified domains; their passwords then stop working.

Each step shows "Done" or "To do", so you can see what is left. The full step-by-step guide is on the Team page.

Collaborating on a report

The owner of a report built with Create a Report can invite people to it with "Invite Collaborator": on the Team page under that report, or from the "Team" button in the report editor. Choose Editor (can write and edit sections) or Viewer (read-only), then "Send invitation". Invitations expire after 7 days. See also the Assurance Trail for assigning, reviewing and commenting on sections.

Branding Paid plans

Branding in the sidebar opens "Corporate Brand". Your brand is applied to exported analysis reports and generated ESG reports: Word, Excel, and PDF.

  • "Company Logo": PNG or JPEG, max 2MB. It appears on the cover page of exported reports.
  • "Company Information": company name and a brand tagline or campaign.
  • "Color Palette": primary, secondary and accent colours for headers, tables and accents.
  • "Typography": heading and body fonts for Word documents (PDF exports use system fonts).

Click "Save Brand Settings". The same brand appears in the "Report Branding" step of Create a Report and in the report editor. Branding is available on Professional, Team and Enterprise.

Pay Per Report

No subscription required. The Pay Per Report page has two cards: "Check an existing report" (analyze a finished PDF, described below) and "Create a new report", which takes you to Create a Report (authoring is free; generating costs $99 for 1 standard, $149 for 2 and $199 for 3 or more).

How it works

1
Go to Pay Per Report in the sidebar.
2
Choose "Estimate (no file)" (type a rough page count) or "Upload PDF (exact)" (the price uses your PDF's real page count).
3
Pick the standards to check against under "Standards to check against".
4
Optional "Add-ons", both of which change the price: "AI-written draft text for every gap" (with "Word density" Low, Medium or High) and "Word (RTF), Excel and PDF export".
5
In upload mode, enter a "Discount code" and click "Apply" if you have one.
6
Click "Pay & run — $X". You are taken to a secure Paddle checkout.
7
After payment you land on "Your pay-per-report" (at /order/{id}). It shows Charged (or Refunded), each analysis as it runs, and "View →" links to the results. The page updates by itself. The report also appears in My Reports.

Pricing model

The price is calculated upfront from your PDF's page count, the selected standards and the add-ons, and charged once at checkout. If every analysis in an order fails, the charge is refunded automatically.

Codes are available via promotions on the homepage or from the ESG Node team. See Discount Codes.

Assurance Readiness All plans

Assurance Readiness prepares you for an external assurance engagement. Upload your report, data and policies: ESG Node reads them the way an assurance practitioner would, then gives you the strengths, weaknesses and gaps, and a full audit plan. Find it in the sidebar under "One-off". It works on any plan, with one payment per check.

1. Set up the check

Under "New readiness check", fill in:

  • "Assurance standard": one standard per check (ISSA 5000 or ISAE 3000 (Revised)). Pick the one your assurer will use; run a second check to cover the other.
  • "Level of assurance you expect": "Limited assurance" or "Reasonable assurance".
  • "Check title" and "Company or entity" (both required).
  • "Industry (optional)" and "Reporting period (optional)".
  • "Reporting criteria": the frameworks your report follows, plus "Other criteria, if not in the list (optional)".
  • "What will be assured (optional)", for example Scope 1 and 2 emissions.

Click "Create and add documents".

2. Add your documents

  • PDF, Word (docx, doc, odt, rtf), PowerPoint (pptx), Excel (xlsx, xls, ods), CSV, text, Markdown, JSON, XML, HTML. Up to 50 MB each, 30 documents per check.
  • Click the box or drop files on it: each file is read as it arrives and shows "Added" with its word count, or why it could not be read. A file type we cannot read is refused before it is sent.
  • "Or add public web pages or documents": one address per line, then "Add". The visible text of each page is read. If a site blocks automated readers, or draws its page with scripts, the page is rendered first. A link to a PDF, Word or Excel file is downloaded and read as that file. When an address cannot be read, the message says why.
  • Scanned PDF pages, and pages that are mostly pictures, are read by the AI model once you pay; the price includes it. Each document shows how many of its pages are read from images. A quote from such a page is marked "(image)" after the page number, so you know to check it against the page itself.

Documents can be changed only before you pay.

3. Pay

"You are paying for" sums up the check: standard, level, criteria, documents and words, the pages read from images (if any), and "30 included" chat messages. Use "Edit setup" to change it before paying. The price starts from $5 and follows your documents; you see it before you pay. Click "Pay $X and start the review". Discount codes do not apply.

4. The review

Stages: "Payment confirmed", "Reading your documents", "Reviewing each area of the standard", "Writing your audit plan". It usually takes 3 to 8 minutes. You can leave the page: the review keeps running, and the result appears under "Your checks".

5. Your audit plan

Tabs: Summary, Information quality, Strengths & gaps, Questions (what the assurer will ask, and whom), Documents (what you will be asked for), Depth, Time frame and Parties. Quotes count only if they are word for word in your documents. Download with "Download PDF", "Download Word (RTF)" or "Download Excel".

6. Chat and plan versions

  • "Ask a question" uses 1 message. "Revise the plan" uses 3 and writes a new plan version.
  • With more than one version, a "Version" picker shows "v1 · first plan", "v2 · revised" and so on. Downloads use the version shown.
  • When fewer than 3 messages are left, "Add 30 messages — $X" buys more for that check.

7. Afterwards

After the real engagement, open "Tell us how your real assurance went" to share what the assurer asked and found. We use it, without your details, to make future plans better.

The plan is ESG Node's AI-assisted reading of your documents. It prepares you for the engagement; it is not an assurance engagement, a conclusion or an opinion. If the review cannot be completed, your payment is refunded in full automatically. Each check is visible only to the person who created it.

Developer API Paid plans

The Developer API lets your own systems run analyses, comparisons and report builds. API in the sidebar opens Settings → "Developer API" (Professional, Team and Enterprise).

  • "Credit wallet": credits are spent per API call and never expire. Click "Buy" on a bundle.
  • "API keys": give the key a label, choose its permissions (analysis, compare, report) and click "Create API key". Copy the key at once: it is not shown again. "Revoke" stops a key.
BundlePriceCredits
Starter$25$25
Growth$85$100
Scale$320$400
Enterprise$1,125$1,500

Any applicable tax is calculated automatically at checkout by our payment partner, Paddle.

A failed API job returns its credits to your wallet automatically. Credits are not refundable once added to your wallet (see the Refund Policy).

Endpoints, costs per call, limits and examples: read the API reference.

Supported Standards

StandardFull nameRequirements
GRI UniversalGRI 1, GRI 2 and GRI 3 (2021)56
GRI Topic33 GRI Topic Standards, from GRI 101 Biodiversity to GRI 418 Customer Privacy198
GRI SectorGRI 11 Oil and Gas, GRI 12 Coal, GRI 13 Agriculture, Aquaculture and Fishing, GRI 14 Mining508
ESRSEuropean Sustainability Reporting Standards: ESRS 1, ESRS 2, E1–E5, S1–S4 and G1137
IFRS S1IFRS S1 — General Requirements for Disclosure of Sustainability-related Financial Information67
IFRS S2IFRS S2 — Climate-related Disclosures52
UK SRS S1UK Sustainability Reporting Standard S135
UK SRS S2UK Sustainability Reporting Standard S233
TNFDTaskforce on Nature-related Financial Disclosures42
<IR>International Integrated Reporting Framework39
IPIECAIPIECA/API/IOGP Sustainability Reporting Guidance for the Oil and Gas Industry120
WBAWorld Benchmarking Alliance Social Transformation Benchmark (partial)143
SEC climate rulesSEC Climate-Related Disclosure Rules (Regulation S-K Subpart 1500, Regulation S-X Article 14 and related parts)75
B LabB Corp standards: Foundation Requirements and 7 impact topics (purpose and governance, fair wages, human rights, JEDI, climate action, environmental stewardship, collective action)184
OJK POJK 51Laporan Keberlanjutan under POJK 51/2017 with the SEOJK 16/2021 index codes, in Bahasa Indonesia. Parts that apply only to some reporters (businesses directly tied to the environment, financial institutions) are separate sections73
OJK RAKBRencana Aksi Keuangan Berkelanjutan (POJK 51/2017 Lampiran I), the action plan financial institutions file with OJK, in Bahasa Indonesia21
PSPK 1PSPK 1 (IAI): Persyaratan Umum Pengungkapan Informasi Keuangan Terkait Keberlanjutan, Indonesia's standard based on IFRS S1, in Bahasa Indonesia67
PSPK 2PSPK 2 (IAI): Pengungkapan Terkait Iklim, based on IFRS S2, in Bahasa Indonesia52

A report written in Bahasa Indonesia gets its analysis, comparisons and exports in Bahasa Indonesia; you can choose the output language when you start a run.

New standards are added periodically. Contact us if you need a standard not listed here.

Requirements & Scoring

Each standard is broken into individual requirements. For every requirement, the AI:

  • Searches your PDF for relevant passages using semantic search
  • Judges whether the passage satisfies the requirement's intent (not just keywords)
  • Assigns Found / Partial / Missing status with a confidence score
  • Extracts the most relevant quote as evidence
  • Generates an improvement suggestion for Partial and Missing items
How to improve your score: For each "Missing" requirement, read the AI-suggested improvement. Use it as a guide to add the appropriate disclosure to your next report draft. Re-upload the revised draft and run a new analysis to measure improvement.

Plans & Limits

Prices

In Settings → Plan, switch between "Monthly" and "Annual" ("2 months free").

PlanMonthlyAnnual
Starter$0$0
Professional$49/mo$490/yr
Team$149/mo$1,490/yr
Enterprise—$6,000/yr. Billed yearly · $3,600/yr in Indonesia, Malaysia, the Philippines, Thailand, Timor-Leste and Vietnam

Any applicable tax is calculated automatically at checkout by our payment partner, Paddle.

What each plan includes

FeatureStarterProfessionalTeamEnterprise
Seats11310 (more by quote)
Monthly analyses63090 (shared)300 (shared)
Monthly uploads31545 (shared)150 (shared)
Pages per report15100300600
Several files → one report (files or links per upload)—51015
AI draft improvements—✓✓✓
Export (Word RTF, Excel, PDF)—✓✓✓
Chat with PDF—✓✓✓
Custom rubrics—510Unlimited
Compare Reports (documents per comparison)—235, plus Wildcard
Materiality Assessment—✓✓✓
Create a Report: generating (writing is free on every plan)Pay per reportPay per report2 a month includedUnlimited (fair use: 10 a day per person)
Corporate branding—✓✓✓
Developer API—✓✓✓
Team collaboration——✓✓
Patch into Report, assurance binder, auditor links——✓✓
Single sign-on———✓
Max file size50 MB50 MB50 MB50 MB

Assurance Readiness, Humanize and Pay Per Report are one-off purchases on any plan.

Upgrading your plan

Go to Settings → Plan in the sidebar. Click the upgrade button of the plan you want and complete the Paddle checkout. Your new plan is active immediately after payment confirmation. On a Team or Enterprise account only the account owner changes the plan. Enterprise is bought yearly, by card or by quote and invoice ("Prefer an invoice? Request a quote"). The first purchase of each paid plan comes with a 7-day money-back guarantee (renewals excluded).

Downgrading or cancelling

Go to Settings → Plan → Billing portal to cancel. To move to a lower plan, email hello@esgnode.com. After cancellation, you keep access until the end of the current billing period, then revert to Starter. Enterprise is an annual contract and runs to the end of its term.

Discount Codes

Discount codes reduce the price of Pay Per Report orders, report generation and new subscriptions.

  • On Pay Per Report ("Upload PDF (exact)" mode): enter the code in the "Discount code" field and click "Apply" before you pay
  • On Create a Report: in the "Generate Full Report" dialog, use the "Discount code" field before "Pay $X & Generate ✦"
  • On a subscription: in Settings → Plan, enter the code in "Have a discount code?" and click "Apply". It applies at checkout to the first payment of a new subscription

Humanize and Assurance Readiness do not take discount codes. Valid codes are sometimes displayed on the ESG Node homepage as a promo banner. They may also be shared via email newsletter.

Codes have expiry dates and usage limits. A code that worked yesterday may no longer be valid today.

Troubleshooting — Analysis Issues

Analysis is stuck on "Processing"

Analyses can take up to 10 minutes for large reports. If it has been more than 15 minutes:

  • Refresh the page — the analysis may have completed
  • Go to My Reports and check the status there
  • If the status shows "Failed", the analysis encountered an error. Run it again. A failed analysis gives its credit back to this month's quota within a few minutes
  • Contact support if the issue persists (see below)

Analysis completed but results look wrong

Common cause: scanned PDF. If your PDF is image-based (no text layer), the AI cannot read the content and will mark most requirements as "Missing". Convert your PDF to a text-based PDF using OCR software before uploading.

Other causes:

  • Report is in a language the standard wasn't designed for — results may be less accurate
  • Report uses abbreviations or codes without explanation — try uploading a version with full terminology
  • Very short reports (under 5 pages) often score poorly because there simply isn't enough content

Low confidence scores across the board

This usually means the PDF text quality is poor, or the report uses vague, generic language that doesn't clearly address specific requirements. Review the requirements marked "Missing" and add more specific, evidence-based disclosures.

"Monthly analysis limit reached…" error

You have used all your analysis credits for this month. With several standards selected, the message reads "This analysis needs N of your monthly analyses (one per standard)…" when fewer credits are left than the run needs: select fewer standards. Other options:

  • Wait for the next monthly reset (1st of the month)
  • Upgrade your plan in Settings → Plan
  • Use Pay Per Report for a one-off analysis without a subscription

"Report page count exceeds your plan limit…" error

The PDF has more pages than your plan analyzes (see File size and page limits). Upgrade to analyze larger documents, or upload only the relevant part.

"Analysis is temporarily unavailable…" (ESGX-SVC-17)

A service issue on our side is stopping new analyses. No analysis was started and your monthly quota has not been used. Try again later, or contact support and quote the reference ESGX-SVC-17.

Troubleshooting — Upload Issues

"File too large. Max 50MB." error

Each file can be up to 50 MB, on every plan (see File size and page limits). Try:

  • Compressing the PDF (use Adobe Acrobat's "Reduce File Size", SmallPDF, or iLovePDF)
  • Removing embedded high-resolution images if they are not critical

"Only PDF files allowed" error

"Single PDF" takes PDF only. Convert your document to PDF first (File → Save as PDF in Word/Google Docs), or use "Several files → one report" on a paid plan.

Upload stalls at 0% or fails mid-upload

  • Check your internet connection — large PDFs require a stable connection
  • Try a different browser (Chrome or Firefox recommended)
  • Disable browser extensions that might block file uploads
  • Try the upload on a different network (e.g. switch from Wi-Fi to mobile hotspot)

"Monthly upload limit reached. Upgrade your plan." error

You have used all your upload slots for this month. Same options as the analysis limit (wait, upgrade, or Pay Per Report).

Troubleshooting — Payment Issues

Checkout page won't open / blank page

Paddle (our payment processor) handles the checkout. If the checkout page does not open:

  • Disable any pop-up blockers for esgnode.com
  • Try a different browser
  • Ensure you are not blocking third-party cookies (Paddle requires them)
  • Check if your browser console shows any errors (F12 → Console)

Payment declined

This is handled by your card issuer, not by ESG Node. Common reasons: daily transaction limit, international card restrictions, insufficient funds. Contact your bank. Paddle supports most major credit and debit cards worldwide.

Paid but plan not upgraded

There is sometimes a 30–60 second delay between payment completion and plan activation. Refresh the page and check your plan in Settings → Plan. If still on the old plan after 5 minutes, contact support with your payment confirmation email.

Charged but analysis did not start (Pay Per Report)

There is no list of orders. After paying you land on "Your pay-per-report" (at /order/{id}), which shows Charged or Refunded and the status of each analysis, with links to the results. The page updates by itself. If every analysis in the order fails, the charge is refunded automatically and the page says so; refunds usually arrive within 5–10 business days. Contact support with your order ID if you do not receive it.

Requesting a refund

Some refunds happen automatically, in full:

  • A Pay Per Report order whose analyses all fail, and a report generation that fails
  • Humanize, if the rewrite cannot be completed
  • Assurance Readiness checks, if the review cannot be completed, and chat message packs that cannot be added
  • A duplicate payment for the same order

A full refund includes the tax charged. For anything else, contact hello@esgnode.com with your order ID and reason. The first purchase of each paid plan can be refunded in full within 7 days; renewals are not refundable. See the Refund Policy.

Troubleshooting — Login & Account

CAPTCHA not loading

The ALTCHA widget requires JavaScript and access to our CAPTCHA server. If it does not appear:

  • Disable ad blockers for esgnode.com
  • Ensure JavaScript is enabled in your browser
  • Try a hard refresh (Ctrl+Shift+R)
  • Try a different browser

"Invalid credentials" even with correct password

Use the Forgot Password flow to reset your password. If you signed up with Google, use "Continue with Google". To add a password, open Profile → "Change Password" within 10 minutes of signing in with Google: the current password is not needed. If that does not help, contact support — your account may have been created with a different email address.

Not receiving emails (welcome, reset, etc.)

  • Check your spam / junk folder
  • Add hello@esgnode.com to your safe senders list
  • Wait up to 5 minutes for delivery
  • Contact support if still not received after 10 minutes

Signed out after 2 minutes

This is the automatic sign-out: 2 minutes without activity in any ESG Node tab signs you out (see Automatic sign-out). Click "Stay signed in" when "Still there?" appears. Unsaved text on the page is kept in that tab and offered back after you sign in again.

Session expires too quickly

Sessions last at most 24 hours, and each account has one session: signing in on another device ends the earlier session ("You were signed out because your account was accessed from another location."). If you are logging in frequently, check that your browser is not clearing cookies or localStorage on exit. If using a browser in private/incognito mode, the session will not persist after the window closes.

Troubleshooting — Export Issues

"Export is available on paid plans, or as a paid add-on per report." error

Export needs a paid plan, or a Pay Per Report order with the export add-on. Upgrade in Settings → Plan.

Exported PDF is blank or garbled

PDFs are built on our server, so your browser does not change the result. Try the export again. If it still fails, download the Word (RTF) or Excel version instead, and contact support with the analysis ID.

No "Actions" menu or export buttons

The "Actions" menu appears only for the owner of a finished analysis. If the analysis is still running, wait for it to finish (refresh the page). If it was shared with you, ask the owner for the export. If the status is "Failed", run the analysis again — contact support if it keeps failing.

Contact Support

We aim to respond within one business day.

✉️
Email support
hello@esgnode.com

Include your account email, the analysis or order ID (if relevant), and a description of the issue. Screenshots are very helpful.

Tip: Before emailing, check this page — most common issues have solutions here. If you found a bug not covered here, please include browser, OS, and steps to reproduce.